Project management template
Plumbline Builders
For a builder with a few crews and an office. Thick borders, off-white and an acid accent give it a site-board feel, and the daily log is quick to fill on a phone.
Opens the prompt in Crisp so you can change it before the build starts.
The look: Raw Concrete.
Loud and raw: off-white, black, thick borders and an acid accent. Headings in Archivo Black, text in IBM Plex Mono.
- background
- surface
- foreground
- primary
- accent
- Opening
- giant type: the name in heavy caps that run edge to edge, a hard-bordered image block offset under it, buttons with a solid offset shadow
- Sections
- blocks with 2px borders and offset shadows, a dense product or release grid, labels in mono type
- Motion
- a scrolling strip of releases or drops between sections, hover lifts the offset shadow
- Texture
- none: borders and offset shadows are the ornament
The screens.
- 01Jobs
- 02Job detail
- 03Daily log
- 04Variations
- 05Deliveries
- 06Crews
- 07Settings
Build a job tracker for Plumbline Builders, a building firm with three site crews doing extensions, loft conversions and refits. The office plans jobs, site leads update them from a phone, and the owner watches money and dates. Data: jobs (address, client name and phone, kind, contract value, start date, planned finish, stage: quoted, booked, groundwork, structure, first fix, plastering, second fix, snagging, complete, site lead), daily logs (job, date, crew on site, weather, work done, problems, photos), variations (job, description, extra cost, approved by the client or not), materials orders (job, supplier, items, cost, delivery date, delivered) and snags (job, item, room, fixed or not). Screens in order. Jobs: a page header with a one-line summary, stat cards for live jobs, jobs behind plan, variations waiting for approval and deliveries due this week, then a table of jobs with stage, days ahead or behind, and contract value plus variations. A job page with a stage tracker, the daily log, variations, orders and the snag list. The daily log form, quick to fill on a phone, with photo upload. A deliveries calendar. Crews, each on a week timeline. Settings for stages and suppliers. Roles: owner, office, and site lead who sees only their own jobs. Seed nine jobs at different stages, two months of daily logs, and some variations and snags.Use this template
What Crisp builds from it
- A job table with stage and days ahead or behind
- Daily site logs with photos, made for phones
- Variations with client approval and running totals
- A deliveries calendar and crew timelines
- Snag lists to close out each job
Change the name, the town and the details to yours before you start. How a build works.